Clifton Suspension Bridge Visitor Centre 2024

The Suspension Bridge, designed by Brunel in 1830 and completed in 1864 following his death as a monument to him, spans the picturesque Avon Gorge. For over 150 years this Grade I Listed structure has attracted visitors from all over the world.

Contacts

Operator: Clifton Suspension Bridge Trust

Address: Bridge Road Leigh Woods Bristol Bristol BS8 3PA

  • Telephone: 0117 974 4664
  • Email: .(JavaScript must be enabled to view this email address)
  • Website: View website

Social Media Profiles

Open Days & Times

Daily 1000-1700. 26 Dec 1100-1600. (Closed 24-25 Dec; 1 Jan 2025.) Visit website for more details.

Travel

  • By Bus: 8
  • By Rail: Bristol Temple Meads / 2 miles

Facilities

  • Souvenir Shop
  • Full disabled access

Register or log in to view location maps

Some more nearby attractions you may be interested in...

Back to top